“I think they are hiding something.”
I agree. Considering it failed right at maximum dynamic loading, supposedly 1/5 the strut’s capacity, means they may not be telling the whole story. The vehicle/payload may have had harmonic vibration issues which they did not calculate or predict. Ergo, a systemic program failure.