To: autumnraine
When work resumes, there will be pay for the days missed. Obama sent out a letter that says as much and that is how it has worked in the past.
It isn’t quite a furlough because people on furlough use up their vacation days to cover the lost time and then are SOL. There is no pay for days lost after that. Only a gratefulness to still have the job.
11 posted on
10/02/2013 5:37:46 AM PDT by
Irenic
(The pencil sharpener and Elmer's glue is put away-- we've lost the red wheel barrow)
To: Irenic
15 posted on
10/02/2013 5:44:45 AM PDT by
autumnraine
(America how long will you be so deaf and dumb to thoe tumbril wheels carrying you to the guillotine?)
To: Irenic
No. It was specific. Even if you had scheduled leave or vacation time it iss now officially cancelled.
17 posted on
10/02/2013 5:47:14 AM PDT by
autumnraine
(America how long will you be so deaf and dumb to thoe tumbril wheels carrying you to the guillotine?)
To: Irenic
Meaning you won’t get paid for scheduled vacation even. They have also sshut down payroll.
.
18 posted on
10/02/2013 5:48:54 AM PDT by
autumnraine
(America how long will you be so deaf and dumb to thoe tumbril wheels carrying you to the guillotine?)