Having worked construction in NYC I can tell you it would have taken less than a day (overtime at that) to secure the boom of that crane. Not bring down the whole rig, just the boom could have been detached from the base and bought into the building or down to the street.
In your informed opinion, what would be the most likely procedure(s) now for securing and lowering that damaged boom?