Thanks Kevmo.
“What Rossi is doing is real but IMHO not practically scalable. I don’t “know” that he changed from 125 x 10Kw units to 300 4.5Kw units for the 1MW system, but I would guess it was due to process variability. Some of the 10Kw units produced 30-50Kw and others only did 5Kw. He found that smaller units had less variability but now he has to juggle 300 instead of 125.”
First I have read that Rossi has had to revamp the 1MW unit scheduled to go operational this fall.