There were two reports yesterday I was looking for a followup on.

1. The shear was the first piece of equipment made ready and BP wanted that first and the administration did not let them use it until other methods used first.

The burning of the oil floating to get rid of it was stopped by environmentalist they said it would cause too much air pollution.

Anyone have an update on those? Thanks.


20 posted on 06/04/2010 6:12:14 AM PDT by edcoil (Kingdoms have never survived. Don't let any new ones be formed.)
[ Post Reply | Private Reply | To 1 | View Replies ]


To: edcoil

I don’t know but it would fit the Jimmuh Cahtuh redux sick rotten and failure-inducing micro-management model Team Tyranny under Usurper Obama uses.


28 posted on 06/04/2010 6:47:47 AM PDT by bvw
[ Post Reply | Private Reply | To 20 | View Replies ]

To: edcoil

I heard cutting the riser and using current desigh top hat was first choice but axed by administration due to increased flow after pipe cut(prior to capping)

I want to know how much interference “engineering” this admin has done causing BP to use less than desirable methods.
Seems to me all input from the admin/Obozo has delayed fixes and made situation worse.
Any links, references appreciated.


33 posted on 06/04/2010 12:14:39 PM PDT by bossmechanic (If all else fails, hit it with a hammer)
[ Post Reply | Private Reply | To 20 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson