I really don’t understand why they cannot do something like that either. How would the methane affect that now that it is coming out of the broken riser vs. coming up a drilling pipe as it did just before the explosion?

I don’t understand why some type of large pipe or hose cannot be lowered, directing the water/oil to some type of tanker, which is then equipped with the “Kevin Costner” device to separate oil from water, and pumps the oil into another tanker and water back into the ocean.


19 posted on 05/28/2010 2:46:14 PM PDT by a real Sheila (Just my 2 cents!)
[ Post Reply | Private Reply | To 14 | View Replies ]


Update on Gulf of Mexico Oil Spill - 28 May, 2010

BP today provided an update on developments in the response to the MC252 oil well incident in the Gulf of Mexico.

Subsea Source Control and Containment

Subsea efforts continue to focus on progressing steps to stop the flow of oil from the well through interventions via the failed Deepwater Horizon blow out preventer (BOP), and to collect the flow of oil from the leak points. These efforts are being carried out in conjunction with industry experts and governmental authorities.

Operations on the top kill procedure continue. Heavy drilling fluids were pumped under pressure into the BOP starting May 26 at 1300CDT, and top kill operations continue through 2400CDT on May 27. It is estimated that the full top kill procedure could extend for another 24 to 48 hours.

If the well were successfully 'killed', it is expected that cementing operations would then follow. The top kill procedure has never before been attempted at these depths and its ultimate success is uncertain.
In parallel with the ongoing top kill operation, preparations have been made for the possible deployment of the lower marine riser package (LMRP) cap containment system.

Deployment would first involve removing the damaged riser from the top of the failed BOP to leave a cleanly-cut pipe at the top of the BOP's LMRP. The cap, a containment device with a sealing grommet, will be connected to a riser from the Discoverer Enterprise drillship, 5,000 feet above on the surface, and placed over the LMRP with the intention of capturing most of the oil and gas flowing from the well.

The LMRP cap is already deployed alongside the BOP in readiness for potential deployment. If it is decided to deploy this option, this would be expected to take some three to four days.

In addition to these steps, planning is being advanced for deploying, if necessary, a second BOP on top of the original failed BOP.

Drilling of two relief wells began on May 2 and May 16. It is estimated that each of these wells will take three months to complete from the commencement of drilling.

22 posted on 05/28/2010 2:55:55 PM PDT by deport
[ Post Reply | Private Reply | To 19 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson