Posted on 06/30/2009 6:29:45 PM PDT by SandRat

BASRAH — The 2nd Brigade Combat Team, 4th Infantry Division completed a key bridge project southeast of Al Qurnah, June 29, increasing traffic flow and enhancing security and trade.
The Swaib Bridge project cost more than $122,000 and included the removal of worn asphalt, fabrication and installation of 22 decking panels, replacement of side barrier posts and the construction of guide rails along both sides of the bridge.
"The completion of this bridge will go a long way into establishing security and economic stability for the people of the region," said Maj. Matthew Cody, 2nd BCT executive officer.
The bridge was originally damaged as a result of an indirect fire attack. It was built over a tributary of the Tigris River during the Iraq-Iran war.
So, this is what we are spending all this money on and having troops stationed over there for? To build freakin’ bridges? What a colossal waste.
Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.