Posted on 09/09/2006 12:54:57 PM PDT by COEXERJ145
TAIPEI, Sept. 09, 2006 -- The Boeing [NYSE: BA] 747-400 Large Cargo Freighter took to the skies for the first time at 10:38 a.m. (UTC/GMT +8 hours) today, initiating the flight test program that will culminate in U.S. Federal Aviation Administration (FAA) certification.
The two-hour, four-minute flight was the first of 250 expected flight test hours for the unique freighter, a specially modified 747-400 that will transport major composite structures of the all-new 787 Dreamliner.
The enormous jet -- with its enlarged upper fuselage that can accommodate three times the cargo by volume of a standard 747-400 freighter -- gracefully took off under rainy skies from Taiwan Taoyuan International Airport (formerly Chiang Kai-Shek International Airport). Boeing flight test pilots, Capts. Joe MacDonald and Randy Wyatt, took the airplane north, and then flew roughly 150 miles south following along the east side of the island before heading north again.
"It went beautifully," MacDonald said after the flight ended. In fact, the airplane handled so well, "quite often during the flight, it was easy to forget you were in an LCF rather than a regular 747-400," he said.
Evergreen Aviation Technologies Corp., part of Taiwan's Evergreen Group, is modifying the fleet of three airplanes at its facility at the airport.
"This is a key moment in the Dreamliner program," said Scott Strode, 787 vice president of Airplane Development and Production. "The LCF fleet is the foundation of our lean, global production system and enables us to meet the unprecedented customer demand for the 787. I congratulate the global LCF team -- our design and production partners, our modification partner EGAT, and our incredible Boeing team -- for this remarkable achievement."
The flight test program is expected to last through the end of the year. The LCF also will complete more than 500 hours of ground testing in Taipei and Seattle combined. This comprehensive test program will ensure the LCF's reliability and ability to fly its intended mission.
After completing initial flight tests in Taiwan, during which the airplane's handling characteristics will be evaluated as well as ensuring the LCF is free from flutter and excessive vibration, the airplane will fly to Seattle's Boeing Field to complete the remainder of the flight test program. The ferry flight to Seattle is expected to occur mid-month. A fleet of three LCFs will ferry 787 assemblies between Nagoya, Japan; Grottaglie, Italy; Wichita, Kan. and Charleston, S.C., before flying them to the Boeing factory in Everett, Wash., for final assembly. The first two LCFs will enter service in early 2007; the third will follow later.
Ping to you.
Wow, that thing's ugly.
what the heck did they ust slap on the external shuttle fuel tank or what
That one funny looking plane. I thought it was a joke. It looks like some sort of giant green leach is eathing the plane.
j
Looks like one of those jumbo Australian beer cans.
I wonder what else it can carry in the future.
Paging Airbust. Paging Airbust. Hey EU, how ya' all doin' over there?
That is one ugly plane. The best part is that the parts it transports create a beautiful plane!!
It will look a lot better when painted.
Good Grief! A "flying sausage"!
looks like a hot dog or a corn dog.
or "Flying Corn Dog"...
Probably anticipating the need for a bigger payload for Air Force One with possibility of President Cankles
If you want on or off my aerospace ping list, please contact me by Freep mail.
Do you think it could do a barrel roll?
I wouldn't want to be the one to try it though.
Yes it could.
A barrel roll is a 1G maneuver.
its still much better looking than the Airbus Beluga
http://en.wikipedia.org/wiki/Image:A300-600ST_1_New_Colour.JPG
Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.