BTW, your post is all wrong. You got one out of four right.
1A Prop 42 Change 1B Transportation 1C Housing 1D Schools 1E Flood Control
I accidentally slipped everything by one letter.
Prop. 1B ($19.9 billion transportation bond): 50 percent "yes,'' 38 percent "no.''
Prop. 1C ($2.85 billion affordable-housing bond): 57 percent "yes,'' 32 percent "no.''
Prop. 1D ($10.4 billion education-facilities bond): 51 percent "yes," 39 percent "no.''
Prop. 1E ($4.1 billion water and flood-control bond): 56 percent "yes,'' 35 percent "no."