14'x 20' @ 1000 sq ft per hour would be 2.8 hours. It 's also not wide enough to do a 15 ft wide banner.
14'x 20' @ 1000 sq ft per hour would be 2.8 hours. It 's also not wide enough to do a 15 ft wide banner A 14x20 is 280 sq ft. 280sqft/1000sqft/hour = .28 hours. 0.28hours x (60 min/hour) = 16.8 minutes which converts to 16 minutes and 48 seconds to be precise. Secondly there are no 15 ft wide printers running around that I'm aware of. This particular one is 42" there are 60" wide printers in both the HP and Xerox series. It prints in 4 parts of 3.5' x 20 and you glue the segments together. Ever watch a billboard go up? |