Free Republic
Browse · Search
News/Activism
Topics · Post Article

To: KevinDavis
I've been keeping a close watch on all the latest developments. This is simply the Block 1 CEV and the deletions are to get it up and running by the 2010-2012 time frame. We'll probably see the everything, including oxygen/methane engines, rover, LEM, and the enlarged 5.5 meter CEV in the Block 3 and later CEVs...IMHO.
6 posted on 01/20/2006 5:46:11 PM PST by Lancer_N3502A
[ Post Reply | Private Reply | To 1 | View Replies ]


To: Lancer_N3502A; All

That is what I'm thinking.. It is sad that we are going back to basics, but we have no choice..


10 posted on 01/20/2006 7:40:05 PM PST by KevinDavis (http://www.cafepress.com/spacefuture)
[ Post Reply | Private Reply | To 6 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson