CorridorWatch.org estimates that TTC-35 could require 5,800 acres of Milam County land to build.
I'll bet that a lot of the East-West roads that the corridor crosses will be terminated at the junction of the road with the corridor. There will be no bridges built to cross the corridor to resume travel on the other portion of the road. I smell a rat.