Free Republic
Browse · Search
News/Activism
Topics · Post Article

To: BulletBobCo
The Comanche program was started in 1983 and had survived many reviews. Initial production was scheduled to begin in 2006.

Could a project begun with 1983 technology be the best option for 2006+ world? Was it reflecting modern technology, or did it become obsolete on the drawing board? (I don't know the specifics of the system.)

125 posted on 02/23/2004 3:55:50 PM PST by atomicpossum
[ Post Reply | Private Reply | To 1 | View Replies ]


To: atomicpossum
Was it reflecting modern technology, or did it become obsolete on the drawing board?

The on board sensors and C4ISR packages being developed were state of the art. The weapons systems was current technology (SAL/RF Hellfire; 2.75" rockets and 20mm turreted gun system. The airframe and most of its components used some of the same stealth technology found on the F-117/B2.

127 posted on 02/23/2004 4:12:50 PM PST by TADSLOS (Right Wing Infidel since 1954)
[ Post Reply | Private Reply | To 125 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson