To: KellyAdmirer
His crew must not have been passing their pre-startup nuke inspections.
That, or they didn't double-initial a red tag on some Saturday morning valve tag inspection. 8<)
Before startup, the crew takes over each system on a nuke boat after the pipes/power/machanical pieces are built. Thereafter, they (the crew) are responsible for operational testing and safety of the reactor, under shipyard guidance.
If NAVSEA 08 (the nuke kings) aren't happy with the boat, ain't nobody happy with the boat.
115 posted on
01/27/2004 1:14:40 PM PST by
Robert A Cook PE
(I can only support FR by donating monthly, but ABBCNNBCBS continue to lie every day!)
To: Robert A. Cook, PE
His crew must not have been passing their pre-startup nuke inspections.Nope, he was boinking a JO's wife...said JO being in his wardroom.
131 posted on
01/28/2004 5:03:19 AM PST by
Poohbah
("Beware the fury of a patient man" -- John Dryden)
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson