Free Republic
Browse · Search
Bloggers & Personal
Topics · Post Article

To: Robert A Cook PE
Yes, I understand structural drawings quite well. What part of “It was a politically-funded project, built by political donors, designed by a (sexist-diversified) politically-correct “team”, constructed for a politically-connected donor company, for a politically connected congressional district. It fell down, people got killed.” do you not understand?

And you've examined the drawings for this project? You might note what the word 'and' denotes in my question. Did the bridge fall down because of loads or something else?

118 posted on 03/18/2018 7:55:56 PM PDT by FirstFlaBn
[ Post Reply | Private Reply | To 110 | View Replies ]


To: FirstFlaBn

Eng-Tips.com has examined the drawings and construction planning documents that have been released.

Yes. No part of this construction sequence, the explanations to date, the re-tensioning sequence, the traffic below, the installation sequence, and the missing bridge parts (tower, mid-bridge temporary support, cable stays, and selection of material for the trusses) make sense to any professional observer based on the collective experience of the engineers reviewing it.


120 posted on 03/18/2018 7:59:52 PM PDT by Robert A Cook PE (I can only donate monthly, but socialists' ABBCNNBCBS continue to lie every day!)
[ Post Reply | Private Reply | To 118 | View Replies ]

Free Republic
Browse · Search
Bloggers & Personal
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson