Hasn’t the Navy already built these?
The “new” thing is size of the SMR. SMR’s are small enough to be built in a factory, and then shipped to the site. Current commercial PWR’s are huge and have to be assembled on site.
Google “vogtle” to look at the AP1000 design. It's huge.