any news on the cost of the nickel powder required for 6 months?
and how long before a electric generator centered around an eCat could be plugged into a home grid?
Rossi has mentioned $100 per six month charge, and says work on electricity production is going on but will take “more time.” They are launching with the thermal unit.
If this does take off, there will be lots of engineers looking at how to generate electricity from this technology. Installation into power stations is one area that Rossi wants to purusue.