I would like to see the hazard survey that was done before the drilling started.
Not sure what that entails but I read some where that BP got the lease from Shell. Supposedly Shell let it go because of volitile subsurface pressures. I have no idea if that is speculation or has some truth to it.
The survey is a good indication from surface to bedrock.