And you've examined the drawings for this project? You might note what the word 'and' denotes in my question. Did the bridge fall down because of loads or something else?
Eng-Tips.com has examined the drawings and construction planning documents that have been released.
Yes. No part of this construction sequence, the explanations to date, the re-tensioning sequence, the traffic below, the installation sequence, and the missing bridge parts (tower, mid-bridge temporary support, cable stays, and selection of material for the trusses) make sense to any professional observer based on the collective experience of the engineers reviewing it.