“MCM was awarded the $14.2 million minority contract to design and build the cable-stayed bridge. “
Well the “minority contract” designer and builder company made the “big time” in the killing fields of the construction business!
I want to know how anyone thinks putting up a span of a cable stayed bridge, without the central tower and cables being there first to hold the load, is a safe, workable idea.
And I am an engineer.