To: PA Engineer
I’m just happy the trains are running again and the steel mills are making the pipe to ship, the machinist and smart guys are building equipment to do the fracking.
Beats the hell out of tearing out RR tracks to make bicycle paths.
26 posted on
07/28/2014 10:03:22 PM PDT by
mylife
To: mylife
Im just happy the trains are running again and the steel mills are making the pipe to ship, the machinist and smart guys are building equipment to do the fracking.
So am I. My Daughter is doing her Junior year (PGE) paid internship with a Flowback company. The only thing that is holding back Western Pa from going full energy development is the government. They are being successful this summer in finding the Utica liquids.
36 posted on
07/28/2014 10:35:54 PM PDT by
PA Engineer
(Liberate America from the Occupation Media.)
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson