"Shuttle-derived Launch Vehicle (SDLV), 80-100 metric tons to LEO."
About time! This was first suggested 20 years ago.
The new director favors the BDB. The old director did not know what a BDB is. The BDB doesn't have to be based on the Space Shuttle, but at least some of the hardware is still in manufacture, so that will avoid some tooling and training costs.