China Dam Switches On Power (Three Gorges Dam)
BBC ^
| 7-12-2003
Posted on 07/12/2003 9:17:30 AM PDT by blam
click here to read article
Navigation: use the links below to view more comments.
first 1-20, 21-28 next last
1
posted on
07/12/2003 9:17:31 AM PDT
by
blam
To: Willie Green
More power for new manufacturing plants. Can't wait to move to China for work.
2
posted on
07/12/2003 9:30:58 AM PDT
by
raybbr
To: All
GOD BLESS OUR MILITARY AND THE UNITED STATES OF AMERICA
|
|
Keep Our Republic Free
Or mail checks to FreeRepublic , LLC PO BOX 9771 FRESNO, CA 93794
or you can use
PayPal at Jimrob@psnw.com
|
STOP BY AND BUMP THE FUNDRAISER It's on the Breaking News Sidebar |
3
posted on
07/12/2003 9:32:31 AM PDT
by
Support Free Republic
(Your support keeps Free Republic going strong!)
To: blam
"they say that if the dam breaks, it would spell disaster for those living down-river."
Beg to differ. That should read WHEN the dam breaks.
China's record of building dams that fail and produce devastating floods is terrible.
Plus, all the weight of that much water is likely to accelerate the next earthquake in that earthquake prone area, which, you guessed it, will quite likely cause failure of the dam.
And, what a wonderful target for terrorists!
One little pop, and Shanghai is GONE!
To: blam
12.9 million kWh per day = 4.70 megawatts. By comparison, Hoover Dam's capacity is slightly more than 2,000 megawatts.
To: blam
I guess they have lots of ding-dongs at the BBC still writing this stuff.
Is it a report on hydroelectric production or more greenie touchie-feelie handwringing?
6
posted on
07/12/2003 11:01:04 AM PDT
by
Publius6961
(Californians are as dumm as a sack of rocks)
To: blam
Wasn't thie the dam that developed several major cracks as it was being filled???
To: blam
The combined energy of all the dam's 26 generators will eventually generate more than 80 billion kWh of electricity each year.Someone correct my math: 80 billion kWh is 80 million Megawatthours, which is 80 thousand Gigawatthours, which is 80 Terawatthours.
80 Terawatthours?
8
posted on
07/12/2003 11:30:31 AM PDT
by
Petronski
(I'm not always cranky.)
To: Petronski
That's a big twinkie.
9
posted on
07/12/2003 11:44:32 AM PDT
by
El Sordo
To: Dubh_Ghlase
re:"Wasn't thie the dam that developed several major cracks as it was being filled???"
No, I think those happened while it was still being built.
To: RonHolzwarth; Carry_Okie; Grampa Dave; farmfriend; Phil V.; eldoradude; ScottinSacto; Boot Hill; ...
"No, I think those happened while it was still being built."Well, actually, there were several articles posted on FR that were composed by the orchestrating "Negativity Nazis" in the American EnvironMental CommuNutty that just HATE any possible economic progress, especially by a Commonist Cuntry like China!!!
They were "crying wolf" again, like they have for decades in this nation... everything from "fish are dying for the evil humans," to "reservoir induced seismicity," to "you'll ruin ecotourism of the commercial whitewater rafting industry," yada, yada, yada!!!
They stopped one here that was 2/3rds completed in 1977 yelling "It's got an ancient FAULT under it" when every danged dam in CA is already built on or near a fault, already!!!
If anyone really cared enough, they could probably trace a distinct connection right back to the CA based "Friends (Fiends) of the River" 501(c)3 corporation that runs interference for CA's "C" corp whitewater rafting ramada who think it's more important to play with water than to slow it down enough to make needed power, grow food and jobs of all kinds, or stop devastating natural environment ruining floods!!!
I also see their "unseen hand" in the attempt to drive farming out of the Klamath Falls scenario because it screws up whitewater rafting flows and their obscene profits!!!
11
posted on
07/12/2003 12:25:20 PM PDT
by
SierraWasp
(The Endangered Species Act had not saved one specie, but has ruined thousands of American Dreams!!!)
To: RonHolzwarth
Actually both .. A series of cracks developed during the pouring of the concrete (poor chinese construction methods) which were subsequently patched.
More cracks have since developed once the resevoir started filling -- but these have been deemed minor and the dam pronounce sound by the Agency overseeng the safety of the dam (yeah I believe that)
The first big test for the dam will be during the upcoming flood season --- the biggest test will be the next earthquake in that region.
As much as I like progress, I think this Dam is the next great Engineering Disaster waiting to happen -- and I think it will happen within the next 5 years.
12
posted on
07/12/2003 12:35:29 PM PDT
by
commish
(Freedom Tastes Sweetest to Those Who Have Fought to Preserve It)
To: commish
This is a "rolled-in-place" concrete dam, not a poured-in-place job like anything we have over here....Its basically built like an earthen dam, except they are using a dryer mix and compacting it instead of vibrating it a form.
I beleive its gonna leak between the layers pretty good, but since its concrete, the danger of washout far less than if it were earth.
13
posted on
07/12/2003 12:42:58 PM PDT
by
Rebelbase
(........The bartender yells, "hey get out of here, we don't serve breakfast!")
To: blam
Damn, I didn't think they could do it!
14
posted on
07/12/2003 12:47:29 PM PDT
by
SwinneySwitch
(Freedom is not Free - Support the Troops!)
To: Rebelbase
Learn something new everyday. I was under the impression that this was a poured dam.
The cracks make more sense now as part of the layering process, and may actually be less of a danger as they would have been in a poured dam. I was taking the cracks to be a result of a poor pouring process and a sign that the dam might be structurally flawed.
Question : what do you rate the chances of one of the layers failing when the ground starts shaking.
15
posted on
07/12/2003 12:48:04 PM PDT
by
commish
(Freedom Tastes Sweetest to Those Who Have Fought to Preserve It)
To: commish
This is one of the largest structures ever built by man (volume), if not the largest. Its gonna be here long after the human race is gone. But by that time, the valleys behind it will have silted over and it will become a very nice waterfall!
16
posted on
07/12/2003 12:53:12 PM PDT
by
Rebelbase
(........The bartender yells, "hey get out of here, we don't serve breakfast!")
To: SierraWasp; countrydummy; AAABEST
EnvironMental CommuNutty You do have a way with words.
17
posted on
07/12/2003 1:06:40 PM PDT
by
farmfriend
( Isaiah 55:10,11)
To: SubMareener
12.9 million KWh/day divided by 24 hours/day = 537.5 MW. Times 26 generators = 13975 MW for the total output. Since there are 365.25 * 24 hours per year, the annual production is 122,504,850 MWh/year, or more than 122 billion kWh per year. Presumably the 80 billion kWh per year figure in the story allows for operation at less than peak output.
To: Petronski; SubMareener
12.9 million Kwh/day divided by 24 hrs/day = 0.537 million killowatts steady power = 0.537 gigawatts = 537 megawatts, versus Hoover Dam's 2000 megawatts
19
posted on
07/12/2003 1:33:31 PM PDT
by
SauronOfMordor
(Java/C++/Unix/Web Developer looking for next gig)
To: Lessismore
Presumably the 80 billion kWh per year figure in the story allows for operation at less than peak output. At any given time, some turbines will be down for maintenence. Plus the sustained power output cannot exceed the physical limits of available water. Most likely, full power would drain the lake fairly quickly.
20
posted on
07/12/2003 1:38:53 PM PDT
by
SauronOfMordor
(Java/C++/Unix/Web Developer looking for next gig)
Navigation: use the links below to view more comments.
first 1-20, 21-28 next last
Disclaimer:
Opinions posted on Free Republic are those of the individual
posters and do not necessarily represent the opinion of Free Republic or its
management. All materials posted herein are protected by copyright law and the
exemption for fair use of copyrighted works.
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson