STAGE 1 EMERGENCY NOTICE [200201305]
The California Independent System Operator is implementing Stage 1 of the Electrical Emergency Plan for the period 07/09/2002 14:40 through 07/09/2002 19:00. The CAISO is continuing to request additional Supplemental Energy bids during this period. The Plan has been implemented for the following reason(s): The California ISO has declared a Stage 1 Emergency. This is due to Extreme High Temperatures throughout the Region. Voluntary load curtailment is requested between 14:40 and 19:00 hours. Participating Transmission Owners are to notify the Utility Distribution Companies within their operational areas. Stage 1: Operating reserves are currently, or forecast to be, less than minimum. Advise the Utility Distribution Company of potential power shortages and request the UDC to advise end-use customers to reduce demand to minimum requirements without disruption of employment or curtailment of industrial production or commerce. Advise the UDC to prepare for possible implementation of interruptible load programs and/or electrical emergency plan. This message is from Market Operations at the California ISO. Notice issued at: 07/09/2002 14:34 ---------------------------------- DISCLAIMER -------------------------------------- This CAISO notice is based on the current conditions of the transmission grid system. While this CAISO notice reflects the most current information available to the CAISO, because transmission grid system conditions are subject to sudden and rapid change without warning, the accuracy of this notice cannot be assured. This CAISO notice is provided solely for informational purposes. Reliance by any party on the contents of this CAISO notice, regardless of any errors, omissions, inaccuracies, and/or subsequent changed conditions shall not be made the basis for any claim, demand or cause for action against the CAISO. Any recipient's decisions or actions that may be based in any way whatsoever on the contents of this CAISO notice shall be the sole responsibility of the recipient. -------------------------------------------------------------------------------------
SYSTEM WARNING NOTIFICATION [200201304] For the period 07/09/2002 14:20 through 07/09/2002 19:00 the ISO is predicting deficiencies in Operating Reserve. Due to high than expected loads and temperatures across the ISO Control Area today. The ISO is issuing a "Warning" notice and is requesting additional Supplemental Energy bids during this period. This message is from Market Operations at the California ISO. Notice issued at: 07/09/2002 14:20 ---------------------------------- DISCLAIMER -------------------------------------- This CAISO notice is based on the current conditions of the transmission grid system. While this CAISO notice reflects the most current information available to the CAISO, because transmission grid system conditions are subject to sudden and rapid change without warning, the accuracy of this notice cannot be assured. This CAISO notice is provided solely for informational purposes. Reliance by any party on the contents of this CAISO notice, regardless of any errors, omissions, inaccuracies, and/or subsequent changed conditions shall not be made the basis for any claim, demand or cause for action against the CAISO. Any recipient's decisions or actions that may be based in any way whatsoever on the contents of this CAISO notice shall be the sole responsibility of the recipient. -------------------------------------------------------------------------------------
Restricted Maintenance Operations [200201303] The ISO is anticipating high loads and temperatures across the ISO Control Area. The California ISO is declaring Restricted Maintenance Operations for the period from 07/09/2002 06:00 through 07/09/2002 22:00. Restricted maintenance operations, as detailed in ISO Operating Procedure E-509, will be in effect. Market participants are cautioned to avoid actions, which may unnecessarily jeopardize generator availability. This message is from Market Operations at the California ISO. Notice issued at: 07/08/2002 16:40 ---------------------------------- DISCLAIMER -------------------------------------- This CAISO notice is based on the current conditions of the transmission grid system. While this CAISO notice reflects the most current information available to the CAISO, because transmission grid system conditions are subject to sudden and rapid change without warning, the accuracy of this notice cannot be assured. This CAISO notice is provided solely for informational purposes. Reliance by any party on the contents of this CAISO notice, regardless of any errors, omissions, inaccuracies, and/or subsequent changed conditions shall not be made the basis for any claim, demand or cause for action against the CAISO. Any recipient's decisions or actions that may be based in any way whatsoever on the contents of this CAISO notice shall be the sole responsibility of the recipient. -------------------------------------------------------------------------------------
|