The uncontrolled failure mode of this is a "non-event" shutdown. Expensive yes, dangerous no.
Even the expense could be mitigated with good engineering. You set up to be able to carry these drainoff bricks safely to a processing plant, and to be able to service the equipment from which drainoff occurred. Fix, new fill, and you’re cooking with atoms again.