Posted on 02/13/2010 12:37:58 AM PST by ErnstStavroBlofeld
Space Exploration Technologies (SpaceX) is beginning integration of the first Falcon 9 at Cape Canaveral, Fla., and says it wont be hurried to complete work despite continuing delays of the first launch.
Our primary objective is a successful first launch and we are taking whatever time necessary to work through the data to our satisfaction before moving forward, says SpaceX director of Florida launch operations Brian Mosdell, who adds that the expected launch will take place one to three months after completing full vehicle integration.
The final delivery to the SpaceX launch site, Space Launch Complex 40 (SLC-40), included the Falcon 9 second stage, which recently completed testing at SpaceXs test facility in McGregor, Texas. When completed, the Falcon 9 will be 154 feet tall and 12 feet in diameter. Atop the vehicle will be a Dragon spacecraft qualification unit.
SpaceX says following integration it will conduct a static firing to demonstrate flight readiness and confirm operation of ground control systems in preparation for actual launch. Although a development version of Falcon 9 was first raised to a vertical position more than a year ago, the qualification and testing of the first flight-ready stages have taken longer than expected. Despite successful test firings of nine first-stage engines in July and August 2008, the first sustained firing of a flight-ready set of Merlin engines was not accomplished until October 2009.
(Excerpt) Read more at aviationnow.com ...
I believe the launch window is set to open March 3rd but I wouldn’t expect it so soon. Whenever it is, I’ll be following it, whether on TV or the internet. Fingers crossed.
Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.