Engineering failure? Probably caused by cost-cutting concerns with substandard materials, rushed construction and sloppy analysis of load and bearing inputs.

No wonder they was a bridge collapse and people will be held criminally and civilly responsible for shoddy construction work. A bridge does not just collapse overnight. Certainly not a new build as in this pedestrian bridge.


42 posted on 03/15/2018 11:42:21 AM PDT by goldstategop (In Memory Of A Dearly Beloved Friend Who Lives In My Heart Forevero)
[ Post Reply | Private Reply | To 7 | View Replies ]


To: All
I was just talking with my sister yesterday about the snowflakes at college now not really learning anything, and I mentioned what's going to happen to our bridges and buildings now. Guess I just got my answer. And then there's this:

$2.3 billion goof: New commuter trains too wide for tunnels (http://www.freerepublic.com/focus/f-news/3639902/posts)

50 posted on 03/15/2018 11:46:38 AM PDT by jackibutterfly (It' funny (NOT ha! ha!). We dehumanize humans and humanize animals.)
[ Post Reply | Private Reply | To 42 | View Replies ]

To: goldstategop

If this happened in China, some engineers would be getting shot right now.


56 posted on 03/15/2018 11:49:22 AM PDT by dfwgator
[ Post Reply | Private Reply | To 42 | View Replies ]

To: goldstategop

The bridge was designed by FIGG Bridge Engineers and built by MCM. Barnhart Crane and Rigging operated the Self-Propelled Modular Transporters that placed the bridge on its permanent supports.

Apparently the bridge was to use some kind of new cement which “cleaned itself” and the bridge was designed to withstand a cat 5 hurricane and last more than 100 years.

I think someone got some splaining to do.


121 posted on 03/15/2018 12:06:32 PM PDT by Mouton (The MSM is a clear and present danger to the republic.)
[ Post Reply | Private Reply | To 42 | View Replies ]

To: goldstategop

As a public university all that information should be public record. You might try a search for the bidding or RFP documents.


125 posted on 03/15/2018 12:07:07 PM PDT by lastchance (Credo.)
[ Post Reply | Private Reply | To 42 | View Replies ]

To: goldstategop

“Probably caused by cost-cutting concerns with substandard materials, rushed construction and sloppy analysis of load and bearing inputs.”

But, I bet the University has a bang-up Diversity Center.


155 posted on 03/15/2018 12:25:11 PM PDT by moovova
[ Post Reply | Private Reply | To 42 | View Replies ]

To: goldstategop
Engineering failure? Probably caused by cost-cutting concerns with substandard materials, rushed construction and sloppy analysis of load and bearing inputs.

I agree with your first 2 reason, but the last would be an engineering failure.
474 posted on 03/15/2018 3:52:44 PM PDT by ratzoe (damn, I miss Barbara Olson)
[ Post Reply | Private Reply | To 42 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson