But they have to keep the spillway above the hole from failing by being undercut by the water.
Nothing 48 hours of drying and prep followed by 120,000 1/3 cubic yard helicopter delivered buckets of high-early ready mix concrete on top of 500 gabions of one foot diameter rip-rap couldn’t take care of in a heartbeat.
Only problem is that those buckets at one every 30 seconds would take one thousand hours to drop in place.