DWR photos



A large crane is used to place materials needed for the Lake Oroville flood control spillway recovery efforts. Jul 7, 2017



Pumped concrete is placed between the stay-in-place concrete forms on the lower chute of the Lake Oroville flood control spillway. Jul 7, 2017




Pumped concrete is placed between the stay-in-place concrete forms on the lower chute. Jul 7, 2017



3,957 posted on 07/08/2017 6:50:48 PM PDT by Ray76 (DRAIN THE SWAMP)
[ Post Reply | Private Reply | To 3956 | View Replies ]


To: abb; meyer; Repeal The 17th; KC Burke; janetjanet998; Jim 0216; Ray76; EternalHope; ...
Stay-In-Place Concrete Pour - Weight blocks on opposite side to counter pour forces - Height of pour visible from original height of Stay-In-Place Metal Mesh



3,962 posted on 07/09/2017 5:11:52 PM PDT by EarthResearcher333
[ Post Reply | Private Reply | To 3957 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson