Has anyone else noticed that there doesn’t seem to be any rebar in the spillway construction?


1,769 posted on 02/23/2017 3:51:34 AM PST by mad_as_he$$ ("It's a war against humanity!" Donald J. Trump)
[ Post Reply | Private Reply | To 1758 | View Replies ]


To: mad_as_he$$

If there is no mesh/rebar/doweling that may be because standard practice when the spillway was built permitted that.


1,770 posted on 02/23/2017 4:07:01 AM PST by mewzilla (I'll vote for the first guy who promises to mail in his SOTU addresses.)
[ Post Reply | Private Reply | To 1769 | View Replies ]

To: mad_as_he$$

I never built a Lake/Dam this size in my career. As I focused on buildings, storm water structures were the incidental size. That being said, aprons, large “lay-down” areas, road beds, all were often built with the main slab segments not having reinforcing in the main body or the segment, but instead having dowels and reinforcing bars at the joints acting as “load transfer bars. These bars in the body of the slab were often smooth and set to slip for movement and then along the perimeter joints deformed bars to lock the segments together.

Building footings, walls, grade beams and structural members all have reinforcing steel throughout. Slabs on grade have temperature mesh except in heavy load bearing instances.


1,775 posted on 02/23/2017 5:14:09 AM PST by KC Burke (If all the world is a stage, I would like to request my lighting be adjusted.)
[ Post Reply | Private Reply | To 1769 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson