To: T-Bird45
a really, really bad pour. No one on that job knew what the hell they were doing.  That can’t be patched. It has to be removed and re-poured.

If this is the only glitch then they're doing fine.  Apparently it isn't and they aren't because the problems go way back to Panama's romantic personality based culture where years ago the Canal's procurement team rejected Bechtel's bid and gave it to the Madrid company's design that the canal pilots now say will never work.   Panamanian concrete was always problematic, we always knew the stuff was dodgy but we could work around it.  The way contractors would meet Canal specs was simply to say, subcontract 5K psi concrete so they could met the requirements for U.S. 3K psi concrete.

The tech/mechanical problems are easy, just do it over until it's done right.  The real problem here is a people problem where them w/ family connections can simply take charge and nobody can stop them.  Thing is that family connections don't help much when it comes to physical/mechanical realities.

29 posted on 08/28/2015 4:03:25 AM PDT by expat_panama
[ Post Reply | Private Reply | To 15 | View Replies ]


To: expat_panama
Thing is that family connections don't help much when it comes to physical/mechanical realities.

A lesson Americans are about to learn, to their peril.

57 posted on 08/28/2015 5:21:57 AM PDT by Lonesome in Massachussets (Men need a reason to shop. Women need a place.)
[ Post Reply | Private Reply | To 29 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson