Free Republic
Browse · Search
News/Activism
Topics · Post Article

Skip to comments.

Can’t keep waiting for stealth fighter, India tells Russia
The Times of India ^ | Nov 25, 2014 | Rajat Pandit

Posted on 11/25/2014 4:31:03 AM PST by sukhoi-30mki

NEW DELHI: Ahead of President Vladimir Putin's visit here early next month, India has told Russia to come back with a plan to substantially reduce the delivery timeframe for the stealth fifth-generation fighter aircraft (FGFA) if it wants to seal the futuristic project by next year.

The plan till now was that India would begin inducting the stealth fighters only 94 months — at the earliest — after the two countries inked the final design and R&D contract, which itself has already been delayed by over two years by now.

"Russia has now been told that India cannot wait for a decade to get the FGFA. The delivery schedules should be compressed instead of IAF waiting for the FGFA till 2024-2025. The Russians will probably respond during Putin's visit," a defence ministry source said on Monday.

As was first reported by TOI, India is already upset with Russia for not giving its experts "full technological access" to the FGFA project despite being an equal funding partner. The final design contract, which is yet to be inked after missing the mid-2012 deadline, envisages the two countries chipping in with $5.5 billion each towards designing, infrastructure build-up, prototype development and flight testing.

With the 127 single-seat FGFA that IAF wants costing extra, India will spend around $25 billion on the entire project. India had already spent $295 million on it after inking the preliminary design contract with Russia in December 2010.

The Indian "perspective multirole fighter" is to be based on the under development Russian FGFA called PAK-FA or Sukhoi T-50, which undertook its first flight-test in January 2010, but will be tweaked to IAF's requirements.

As per the initial plan, with Indian scientists and experts also being based in Russia, the Ozar facility of Hindustan Aeronautics in Nashik was to get three FGFA prototypes in 2014, 2017 and 2019 for test-flying by IAF pilots. The final production was to begin only around 2022. All these timelines, of course, have gone awry with the final design contract yet to be sealed.

With IAF down to just 34 fighter squadrons, when at least 44 are required, alarm bells have finally begun to clang loudly in the Indian defence establishment over the long delays in all its three fighter induction projects.

The indigenous Tejas light combat aircraft, first approved in 1983, for instance, will get final operational clearance only by mid-2015. But IAF will get what it actually wants, the four Tejas Mark-II squadrons, from 2022 onwards.

Negotiations for the almost $20 billion MMRCA (medium multirole combat aircraft) project for 126 Rafale fighters, too, are stuck with France yet to accept full responsibility for the 108 of the jets to be produced in India. "MoD wants at least two of the three projects (FGFA, LCA and MMRCA) to be speeded up," said a source.


TOPICS: Foreign Affairs; News/Current Events
KEYWORDS: aerospace; india; russia; stealth

1 posted on 11/25/2014 4:31:04 AM PST by sukhoi-30mki
[ Post Reply | Private Reply | View Replies]

To: sukhoi-30mki

How long was the gestation period for the F-22? How long has the F-35 been in development and the clock is still ticking? Patience, India, patience.


2 posted on 11/25/2014 5:01:56 AM PST by Yo-Yo (Is the /sarc tag really necessary?)
[ Post Reply | Private Reply | To 1 | View Replies]

To: sukhoi-30mki

At the rate things are going, India may just instead buy a lot more Dassault Rafale fighters—including a way larger production run locally by Hindustan Aeronautics Limited than originally intended.


3 posted on 11/25/2014 5:06:14 AM PST by RayChuang88 (FairTax: America's economic cure)
[ Post Reply | Private Reply | To 1 | View Replies]

To: Yo-Yo
sometimes i wonder if the 35 was ever meant to fly and rather just suck up money instead
4 posted on 11/25/2014 3:57:09 PM PST by Chode (Stand UP and Be Counted, or line up and be numbered - *DTOM* -w- NO Pity for the LAZY - 86-44)
[ Post Reply | Private Reply | To 2 | View Replies]

Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.

Free Republic
Browse · Search
News/Activism
Topics · Post Article

FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson