Free Republic
Browse · Search
News/Activism
Topics · Post Article

To: Pontiac

Won’t work. There is to much heat required to set the material. Mountain Tunnel is 18.3 miles long and 10 foot in diameter.


26 posted on 08/14/2014 5:14:59 AM PDT by mad_as_he$$
[ Post Reply | Private Reply | To 4 | View Replies ]


To: mad_as_he$$
Won’t work. There is to much heat required to set the material. Mountain Tunnel is 18.3 miles long and 10 foot in diameter.

Sure it wouldn’t be easy.

I can imagine that the tunnel would be relined in sections. The surface of the tunnel would have to cleaned, any cracks grouted and then preheated before the liners was extruded in to place.

39 posted on 08/14/2014 8:38:31 PM PDT by Pontiac (The welfare state must fail because it is contrary to human nature and diminishes the human spirit.)
[ Post Reply | Private Reply | To 26 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson