To: DoughtyOne

All of these contracts are design/build. SOP.

They have to finalize design specs based on the local terrain/soil, and are responsible for having them certified by professional engineers. The contractor has to thereby assume responsibility/liability for the soundness of the project.


11 posted on 12/02/2019 6:31:46 PM PST by BeauBo
[ Post Reply | Private Reply | To 8 | View Replies ]


To: BeauBo

That’s fine. I just don’t want them to deviate from the steel bollard design we’ve seen thus far.


15 posted on 12/02/2019 7:07:30 PM PST by DoughtyOne (Pledge: "...and to the Democracy for which it stands..." I give up. Use the democRat meme...)
[ Post Reply | Private Reply | To 11 | View Replies ]