All of these contracts are design/build. SOP.
They have to finalize design specs based on the local terrain/soil, and are responsible for having them certified by professional engineers. The contractor has to thereby assume responsibility/liability for the soundness of the project.
That’s fine. I just don’t want them to deviate from the steel bollard design we’ve seen thus far.