2003?.....................and they are still arguing over the DESIGN?........................
Some highway projects can take 20 years or longer to complete.
The I-69 extension in Indiana (I-69 Section of Independent Utility (SIU) 3 from I-465 at Indianapolis to I-64 at Evansville was proposed in 1998. Sections 1 through 4 are complete.
Section 5 (a 21 mile upgrade of State Road 37 near Bloomington) is under construction.
Section 6 is still in the planning stages and will not be done until 2020.
The Bridge over the Ohio river (SIU 4) to link I-69 in Indiana to the sections of I-69 complete in Kentucky are only in the pre design stages.
http://www.aaroads.com/forum/index.php?topic=4855.2175