Posted on 10/16/2013 9:26:30 AM PDT by Nachum
I think they hired UPS and not USPS!
I have worked in the government on and off for 40 years.
During that time I became quite familiar with requisitions, bidding, awarding contracts etc.
It is a time consuming process with bean-counters and pencil-necked bureaucrats every step of the way.
The simplest request takes months not days or hours.
In less than 8 hours of the shutdown, miraculously, professionally printed 3X4 foot signs appeared all over the country in the tens of thousands
saying-this [park, facility, etc. with custom logos] closed due to the government shutdown.
There has not been a government shutdown in 17 years.
These signs were designed, specifications were determined, signs were then requisitioned, bids were posted and vetted, government contracts were awarded.
The materials were then ordered and the signs manufactured then distributed through U.S. Mails or freight companies.
This shutdown was orchestrated and planned well in advance at least 6-8 months ago.
Millions of tax dollars were appropriated and spent in this process.
There is a paper trail a mile long leading directly to the White House.
During Watergate, they started with the small fry and got them to roll and/or provide information until they got to the top.
Any number of charges could be brought - abuse of power, conspiracy, denying American citizens their civil rights - that would have this POS squealing like a stuck pig.
Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.