The riser is the big pipe (21 inch diameter) that comes off the top of the valve stack (the blowout preventer). The riser goes from the sea floor to the drill platform. When the platform sank, the riser fell into the sea and split open. Now they are cutting it clean off at the top of the BOP to attach another pipe which should pick up most of the oil.
.