To: LA Woman3
It shouldn't take an architectural firm too much time or money for this project. They can use the blueprints from the original construction of the stadium. I hope that they get a refund from the original architectural firm. The roof FAILED to survive a CAT4 Hurricane. While it was supposed to be designed to survive a CAT5 Hurricane.
To: rerat0120
While it was supposed to be designed to survive a CAT5 Hurricane.
I was unaware it was built to withstand a cat 5.
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson