To: Dr. Sivana
Two words: Change Control.
To: TechJunkYard
Two words: Change Control
Some change controls inherently have no or poor backout alternatives. Soemtimes you can perform what looks like a perfectly good Change, and the problem doesn't show up until related systems are on for twelve hours and try to execute something that no longer works. Besides that, some Change Controls do not account for all stakeholders until it is too late. Backup admins are inexplicably left out of the loop all too many times.
30 posted on
07/10/2022 2:06:42 PM PDT by
Dr. Sivana
(What was 35% of the Rep. Party is now 85%. And it’s too late to turn back—Mac Stipanovich )
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson