I’m about as pro nuclear power as you get....but, this site has a few issues:

Construction was run by the Unions.
Union workers had contests to see who could go the longest without actually doing any work....those periods were measured in weeks.
The Unions had the Quality Control staff intimidated, so many flaws went unreported.
Unit 2 was pretty far along before they recognized it was constructed 180 degrees out of synch from the design.

Aside from all of that, the enviro-whackos, who disapprove of ANY effective electric power generation, don’t care whether there are any real issues with the facility. They just want it shut down.


7 posted on 09/02/2015 8:54:01 AM PDT by G Larry (Obama is replicating the instruments of the fall of Rome)
[ Post Reply | Private Reply | To 5 | View Replies ]


To: G Larry

My personal experience is that each of these utility company’s that wanted to build nukes got way in over their heads too fast.

The feds should have had standardized designs for boiling water reactors and pressure water reactors. The only modification would be based upon seismic conditions. In reality each of these plants is a one off design (except for twin or triplet reactors. In Washington we had WPPSS (Washington Public Power Supply System) that set out to build 5 reactors (Plant 1&4PWR twins Richland, WA) (Plants 3&5 PWR twins, Satsop, WA) and (Plant 2 BWR Richland, WA). Plants 1&4 were completely different in building layout and design then Plants 3&5 and in the end none of those 4 were ever completed. Only plant 2 was completed in 1984 and is operational today.

My point is you can’t blame this all on the union guys standing around. We had to stand around because of the constant redesign of the smallest of systems. Multiple plants that were twins or triplets didn’t really face these issues because the first plant would get all the redesign and the later plants were built that much faster. As a example at the time they shut down Plant 1&4 plant one had been under construction for 5 years and was estimated 80% and plant 4 had only been under construction for 3 years and was 65%. The joke was that plant 4 would be completed before plant 1.


11 posted on 09/02/2015 9:43:13 AM PDT by shotgun
[ Post Reply | Private Reply | To 7 | View Replies ]

Free Republic
Browse · Search
General/Chat
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson