Here is your confirmation:
http://blogs.seattletimes.com/today/2014/01/whats-blocking-bertha-a-huge-steel-pipe/
How could WA permit a huge steel pipe and then forget they did it? And what’s that huge steel pipe doing? This is red-tape on Xanax.
There was no engineer to say, hey, we need to detour around the ‘huge steel pipe’ here?