Standard feeder (last leg) is 7200V, the transformers are 60:1 step down to 240v two phase. I work high voltage/high current lines in the water & sewer department. We always have two people for safety, especially around the 480v lines.
- Traveler
7.2 kV with beaucoup amps behind it can create quite an arc.