Posted on 11/17/2026 11:03:16 AM PST by SunkenCiv
The Moon has always fascinated us. Every human who ever lived has looked up at it and wondered what it would be like to stand there. Twelve people found out, and none of them stayed even four days. We're explorers and settlers at heart, and the Moon is the next great goal. But how would we even settle a place like that? Is it possible at all? NASA wants to find out! And it just set the plan in motion, together with giants like SpaceX and Blue Origin. But can they really do it? And what does NASA's plan look like? Let's build ourselves a Moon Base!
NASA's Moon Base Plan Is Bigger Than You Think | 24:12
What about it!? | 677K subscribers | 70,272 views | November 17, 2026
(Excerpt) Read more at youtube.com ...
|
Click here: to donate by Credit Card Or here: to donate by PayPal Or by mail to: Free Republic, LLC - PO Box 9771 - Fresno, CA 93794 Thank you very much and God bless you. |
0:00 The New Race to the Moon
2:24 The Five Essential Building Blocks
4:08 Scouting the Coldest Places on the Moon
7:47 The Heavy Lift Logistics of Lunar Delivery
11:59 Powering and Connecting the Lunar Frontier
22:16 From Artistic Dreams to a Concrete To-Do List
The YouTube transcript was processed with my fine country craftsmanship, and *may* follow.
🚀🛰️
Transcript
Chapter 1: The New Race to the Moon
The Moon has always fascinated us. Many humans who lived after the Apollo program have looked up at it and wondered what it would be like to stand there. Twelve people found out, and none of them stayed even four days. We’re explorers and settlers at heart, and the Moon is the next great goal. But how would we even settle a place like that? Is it possible at all? NASA wants to find out! And it just set the plan in motion, together with giants like SpaceX and Blue Origin. can they really do it? And what does NASA’s plan look like? Let’s build ourselves a Moon Base! My name is Felix. Welcome to What About It!? Let’s dive right in!
Today, we build a Moon Base, step by step, the way NASA wants to do it. Once it’s standing, we’ll take a look at life up there 10 years from now. NASA’s boss has already described it. We’ll talk about that in the end. For more than 50 years, a base on the Moon was a plan for some other decade. Then this happened, in just three weeks.
On October 23rd, NASA laid out how it wants to speed up Artemis. On November 3rd, the White House signed a proclamation about the Moon. On November 5th, Blue Origin showed a new stage and a new engine for its New Glenn rocket. On November 7th, NASA handed out a whole stack of Moon Base contracts at Kennedy Space Center. On November 9th, NASA Administrator Jared Isaacman explained the thinking behind it to my friend Tim Dodd, the Everyday Astronaut, inside the Vehicle Assembly Building.
So why is this all happening at the same time? Where are we headed? Two reasons. The first one is a deadline from the very top. The proclamation from November 3rd is called “The American Declaration of Freedom in Space”. It says America will return to the Moon by 2028 and lay the foundation for a permanent there. A proclamation doesn’t build anything. But it tells every company in this video that the customer is serious. The second reason? One word: China. China wants to land its own astronauts on the Moon by 2030. Isaacman says it openly: this is a space race. Nobody at NASA wants to be second at the South Pole. So the clock is ticking.
Chapter 2: The Five Essential Building Blocks
But what does it take to build a base on the Moon? Five components are essential. A plan, a scout that finds the right spot. Trucks that bring the cargo. Infrastructure like Power and a phone line. And a ride for the people. Every single one starts with a problem that sounds impossible. Component number one: the plan. It starts with a strange choice. NASA announced the Moon Base in March, at an event called Ignition. Since then, it has been its own program with its own manager, and it comes in three phases.
Phase one runs until 2029: get there reliably, experiment, and learn. That’s the robot phase, with more than 20 robotic landings near the South Pole. Phase two, 2029 to 2032: build and expand. Power, cargo, and communications. Phase three, from 2032 on: live and work on the Moon in a permanent outpost. Humans living on another world, in the 2030s.
Let that sink in! But at the South Pole? It’s one of the coldest, darkest places in our solar system. Why not pick a more pleasant spot? Some craters down there haven’t seen sunlight in billions of years. Inside, it gets as cold as -203° Celsius. That is -334 Fahrenheit. But that is exactly the point. Scientists expect water ice in that darkness. Ice means drinking water, oxygen, and one day rocket propellant. The worst place on the Moon could be the best place to live off the land. There’s just one problem. Nobody knows how much ice is really down there. So before we build, we need to scout.
Chapter 3: Scouting the Coldest Places on the Moon
And a scout has a brutal job. It has to drive into craters that sunlight never reaches. Solar panels are useless there, so it needs nuclear power. The problem: a nuclear rover normally costs billions. The Perseverance mission cost about $2.7 billion alone. And NASA wants one on the Moon in late 2028, for a fraction of that. How?
The answer is the big surprise of November 7th, a rover called PROMISE. Six wheels, about the size of a small SUV. But NASA didn’t design it from scratch. Its body, electronics, and wheels come from the twin of the Curiosity Mars rover, the one that stayed on Earth for testing. JPL fills in the rest with spare parts from Curiosity and Perseverance. Its power source is a spare nuclear generator, the same kind that keeps the Mars rovers alive. In a nutshell, it turns the heat of decaying plutonium into electricity. That lets PROMISE drive into the permanently dark craters, survive the lunar night, and drill 1 m deep to look for ice. And Isaacman’s logic is wonderfully simple.
The parts were sitting in a garage. The plutonium is 20 years old, too weak for a trip to the outer planets. So put them together and send them to the Moon. NASA expects the whole mission to cost less than $400 million, delivery included. I love this part. Guess who delivers it! Blue Origin. On a Blue Moon Mark 1 lander, for $94 million, with another $140 million as an option. Efficient! PROMISE doesn’t scout alone, though.
[ad text redacted]
PROMISE carries copies of VIPER’s drill and three of its instruments, so the two rovers can compare two different places at the South Pole. Two lunar terrain vehicles, the cars for the astronauts, also ride down on Blue Moon landers. On top of that, a group of hopping drones called MoonFall will scout places no rover can reach. PROMISE flies on Mark 1 number five. That’s five Blue Moon landers by the end of 2028. A Mars rover twin on the Moon. Smart recycling or a risky shortcut? Tell me in the comments! These scouts are reasonably lightweight.
It’s nyew!
Chapter 4: The Heavy Lift Logistics of Lunar Delivery
A base is heavy. Who brings the cargo? NASA doesn’t build the lander. It buys the delivery, like a parcel service. So far, the deliveries were small. Most landers of round one carry a few hundred kilograms. Great for science. Far too small for a base. So on November 7th, NASA opened round two. This one plays in a different league. CLPS 2 runs for 10 years and is worth up to $10 billion. It’s built for landers that carry 2 to 6 tons. Eight companies are allowed to bid: Blue Origin, Firefly, Intuitive Machines, ispace U.S., Lockheed Martin, Northrop Grumman, Voyager Technologies, and SpaceX.
And round one isn’t over, either. NASA raised its budget from 2.6 to 4.2 billion dollars, and four more landings are already booked for late 2028. Yeah, SpaceX is on that list! SpaceX has been on NASA’s vendor list since 2019, but it has never flown a Moon delivery under it. A few hundred kilograms is not a job for Starship. The big exception in round one is Blue Moon Mark 1, with up to 3 tons. But now the parcels grow. Above round two sit the heavy trucks: the cargo versions of Starship and Blue Moon Mark 2, with about 15 tons to the surface per flight.
But there’s a gap in that plan. A lander is only the last mile. Between the rocket and the lander, NASA wants a new kind of vehicle: space tugs. NASA calls them long-distance freight trucks. A rocket drops them off in Earth orbit, and they haul the cargo the rest of the way to the Moon. On November 7th, NASA ordered six of those missions for about 1.3 billion dollars. Blue Origin gets three, all on New Glenn. Two with its own tug, Blue Ring, and one that carries the MoonFall drones on Firefly’s tug, Elytra. A small company called Arrow flies CAPSTONE 2 on a Falcon 9 with a tug from Quantum Space. That’s two small spacecraft that test navigation around the Moon.
Then there’s Impulse Space. A very special story! That’s the company of Tom Mueller, the man who designed SpaceX’s Merlin engine. Impulse gets two missions. One launches on a Falcon 9 with communications satellites from Intuitive Machines. The other one is bigger. Relativity’s Terran R rocket carries Impulse’s Helios kick stage and a brand-new Impulse lander. The lander drops off NASA payloads near the Moon and then tries a landing itself. Mueller’s comment: “After more than 30 years in rocketry, I am ecstatic to be sending hardware to the Moon for the first time.” Think about that. The man behind the Merlin engine has never sent anything to the Moon. Until now! Helios is already real hardware.
Impulse just showed its tank coming out of the weld cell. And it’s set up very flexibly. NASA buys the ride first and picks the cargo later. For several of these flights, the payload isn’t chosen yet. Whatever is ready, flies. Isaacman put it this way: you want “the flexibility to move pieces around.” Fly often, learn, and get better with every mission. That should sound familiar to everyone who has watched Starbase for a few years. So our base has a plan, scouts, and trucks. But it still has no power, no signal, and nobody living in it. Plus, one of the next contracts sends a Starship toward the Moon.
[plug for the channel redacted]
Chapter 5: Powering and Connecting the Lunar Frontier
Back to our Moon Base. Right now, it has no power and no signal. That’s component number four.
Think about a rover deep inside a dark crater. It needs two things from the electricity and a connection. NASA’s first answer is called miniCAST, a mini communications and solar tower. A mast with solar arrays, batteries, a radio, and wireless charging. Redwire supplies the roll-out solar arrays. Honeybee Robotics, a Blue Origin company, supplies the batteries. Yank Technologies supplies the wireless power. The idea: a rover drives up to the tower, parks on a charging plate, and fills up. No plug.
Why? Because Moon dust ruins plugs. A charging station on the Moon. How cool is that? Private companies aren’t even waiting for NASA. Astrolab is one of the two companies building the astronauts’ Moon car. On November 4th, it showed its own power and communications node, called LUMIS. A solar tower with batteries, Wi-Fi, 5G, and a link back to Earth. 2 kW per node at first, 20 later, and enough reserves to run more than 400 hours in the dark. The first one is supposed to fly in 2028, together with Astrolab’s FLEX rover. On a Starship. The really big power comes later.
NASA is working on a fission reactor for the Moon. Until then, towers like these are the power grid. Okay, so that’s the power. But how do you call home from the South Pole of the Moon? NASA’s answer is the Starship mission nobody saw coming. NASA selected SpaceX for something called the Cislunar Communications Deployment Demonstration. Yeah, complicated words. Cislunar means the space between Earth and the Moon. In 2028, a Starship is supposed to carry Starlink satellites out there and release them.
NASA stresses that this is a test, not the final network. But think about what this means. A Starship, flying a NASA mission toward the Moon, in the same year the first astronauts are supposed to land. It’s the first step towards something like Starlink for the Moon. Which brings us to component number five, the hardest one. The people. Everything so far was cargo. If a cargo lander fails, you build another one. With a crew on board, that’s not an option. So NASA takes it step by step. Artemis III flies next year and stays in Earth orbit. Orion docks with a Blue Moon test lander first, and then with a Starship test lander. Artemis IV, in 2028, is the crewed landing on the Moon.
Now it gets exciting. NASA still hasn’t decided which lander goes first. Whoever is ready! Both landers changed for that. Starship fills up in Earth orbit, meets Orion there, and then pushes Orion all the way to the Moon. Blue Moon Mark 2 skips refueling for now and uses three transfer stages instead. The first visit will be short. Two astronauts go down, for two moonwalks of about two hours each. For those, NASA and Axiom Space are developing a second, lighter spacesuit, about half the weight of the big one. Get there first. Stay longer later.
One example is that the SLS rocket for Artemis III flies without an upper stage. It only goes to Earth orbit, so a simple spacer sits where the stage would be. Isaacman wants it rolled out before the end of this year for a tanking test. For the landing missions, NASA wants a stretched Centaur upper stage from ULA. The big upper stage Boeing was building is gone, and it’s good that way. The goal is one SLS launch every six to eight months. His reason: you have to fly every year, or you lose the people who know how.
Remember the question from the beginning? Why is all of this happening at once? There’s a third reason, and it comes from Isaacman himself. He calls it “a lot of littles”. Many small missions instead of one giant program that takes 10 years and then gets canceled. Put wins on the board, earn trust, and then do the next, harder thing. PROMISE is exactly that. NASA also builds hardware itself again. A troublesome hydrogen connector on SLS was redesigned, built, and tested in the house in 5 months, for about a tenth of what a supplier wanted. That’s the mindset behind every contract in this video.
Now back to that new stage from Blue Origin. It’s a bigger deal than it sounds. On November 5th, Blue Origin CEO Dave Limp unveiled GS3, a third stage for New Glenn. 37 ft tall, that’s about 11 m and powered by the BE-7, the same hydrogen engine that lands Blue Moon. Its hydrogen tank is made of carbon composite, and Blue Origin expects it to be the first of its kind ever flown in space. With GS3, the big version of New Glenn, called 9 by 4, can send 20 tons toward the Moon. The first flight is planned for 2028, already booked by a government customer for a mission to lunar space. The same day came Northstar, a new booster engine. 715,000 lb of thrust, up from 640,000 on the BE-4, with 30% less mass and half the parts. Raptor 3 anyone?
So, why does that matter for our Moon Base? Because of Orion. 9 by 4 with an upgraded GS3 could launch Orion to the Moon. Think about that for a second. Orion, without SLS. Let’s do the math. Orion with its service module weighs about 26 tons. Blue Origin lists 20 tons toward the Moon for the 9 by 4 with GS3. That’s 6 tons short. But that’s with 9 BE-4s. Northstar brings almost 12% more thrust per engine, and it’s lighter, too. Plus, the 9 by 4 is designed to lift more than 70 tons into low Earth orbit. The muscle is there. 9 by 4 with Northstar engines and GS3 should easily push Orion to the Moon. No SLS needed anymore!
Sure, the rocket would have to be rated for crew first, and for now, SLS is still the only one that can do it. But Isaacman said it in the interview: Orion will clearly live on beyond SLS. Now we know what could be under it. There’s a catch, though. A big one. New Glenn hasn’t flown since its pad explosion in May. In a memo to his team, Limp just moved the return to flight to January 2027. Five Blue Moon landers, three tug missions, and a crew lander are all waiting for that rocket.
So, can anyone help Blue Origin? What about SpaceX? Florida is getting ready. The Starship Moon lander launches from Florida, and Pad 39A is warming up. In the first week of November, the chopsticks on the Florida tower got a workout. A day later, the pad ran a full water deluge test, and then a second one. Flight 15, which we covered in the last episode, was all about getting ships back. For the Moon, the next big test is refueling in orbit, planned for early next year. No refueling, no Moon landing with Starship. And Musk, of course, is already thinking bigger.
On November 6th, he posted: “It is so tempting to make a 500 ton thrust Raptor 4 in place of the 250 ton Raptor 3 for the outer ring of the Starship booster.” What? Let’s do the math. The booster has 33 engines, 20 of them in the outer ring. Today, that’s 8,250 tons of thrust in total. With 500-ton engines in the outer ring, it would be 13,250. What? 60% more. A booster like that could lift a heavier ship with more propellant, and more propellant per launch means fewer tanker flights for every Moon landing. Tempting is not a plan. But it shows how much room Starship still has to grow.
So, what are we looking at? Let’s add it up. Starship: the crew lander that pushes Orion to the Moon. The heavy cargo lander, with Japan’s pressurized rover penciled in for 2032 at the earliest. The Starlink test in lunar space, Astroscale’s rover and power node. Half a ton of cargo for the Japanese company ispace. And a seat at the table for $10 billion of deliveries. Blue Origin: five Mark 1 landers with rovers and Moon cars. The Mark 2 crew lander. Three tug missions on New Glenn. The batteries for the first power tower. And maybe, one day, the rocket under Orion. Two companies carry most of this plan. So, can they really do it?
Both still owe NASA the same thing: proof. For SpaceX, that’s refueling in orbit. For Blue Origin, that’s a rocket that flies again reliably. Everything else in this video waits for those two. But one question is left. Once everything is delivered, who puts our base together? Probably not astronauts.
A robot from Caltech, funded by DARPA, has built part of a structure in orbit. On its own. The experiment is called ASTRA. It launched on a Falcon 9 in March, and its robotic arm picked up tubes and joints one by one and put them together. The researchers call it the first autonomous construction of a structure in space. Sounds good. It didn’t finish the whole antenna that was planned. But it proved the idea. That’s exactly what Isaacman wants for the Moon. He said it to Tim: spacewalks should be the last resort, and the robotics have to be, in his words, “off the charts”. A base where the crew changes every six months gets built by machines, not by astronauts with shovels. So after all this, where is all of this going?
Chapter 6: From Artistic Dreams to a Concrete To-Do List
Last week, NASA posted old paintings. Moon bases, the way artists imagined them from the 1960s to the 1990s. Beautiful. But not one of them was ever built. Back then, there was a picture. Today, there is a delivery schedule.
2027: Artemis III, VIPER, and the first refueling in orbit. 2028: the landing, PROMISE, the Moon cars, the tugs, and a Starship in lunar space.
2029 to 2032: the heavy trucks, power, and communications.
After 2032: habitats.
That’s the plan. Isaacman’s picture for 10 years from now: the Moon Base runs like the International Space Station, with a new crew at least every 6 months. So, will every date hold? Of course not. Every chart like this slips. But look again at who shows up in almost every line of that plan. SpaceX and Blue Origin. Two companies that didn’t even exist when those paintings were made. This time, the hardware is being welded, tested, and paid for. So, is a Moon Base possible at all? Well, for the first time, it is not a painting anymore. It’s a to-do list.
You tell me. Is it possible? Let me know in the comments! And that’s it for today! Smash that like button. Subscribe for more! This is what fuels the Algorithm! And this is how you can help us for free! Check out our epic shirts in your favorite space nerd store! Our all-time favorite Raptor Engine design, and countless others, are there for you to explore! Click the card or the US or worldwide link in the description of the video! History, History is being written in real time. If you want to catch the other historic stories from recent weeks, click the video on screen and continue the journey now. Thank you so much for watching, and I’ll see you again in the next episode!
I like the repurposing of unused parts, getting some actual use out of old pork barrel surplus rather than allowing it to continue to rot. Isaacman was soooo the right guy for the job.
Moon Mann Otto:
https://picclick.com/Modern-Biology-Moon-Mann-Otto-1956-Vintage-Pictorial-960204804464.html
Just don’t store piles of nuclear waste on the moon after we’re there, and it’s all good...
Ha. We can’t even keep planes flying. Just wait until the DSA is in charge, you can be sure DEI will make that moon base something special.
Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.