Free Republic
Browse · Search
General/Chat
Topics · Post Article

To: Governor Dinwiddie

That’s problem with Trump bragging about “drill baby drill”. How about “build baby build” new refineries? Where are new nuclear reactors? We have the majority in this admin just like his first term and we should be doing bigger things


10 posted on 11/22/2025 5:00:54 PM PST by Blue Highway
[ Post Reply | Private Reply | To 4 | View Replies ]


To: Blue Highway
I agree 100% 👍

Before Henry Ford, every automobile had to be hand built. Ford introduced an assembly line
and standard interchangeable parts. The same thing should be done for nuclear reactors.

Westinghouse and GE both have basic designs; nonetheless, each design has to be highly
customized for ever new installation. A universal approved standard design could hasten
the build time, and shave years off the process. Heck, contracts could be awarded to both
Westinghouse and GE, each building a part of the design.

President Trump could do what he does best, kick ass and take names.

17 posted on 11/22/2025 6:09:58 PM PST by Governor Dinwiddie ( O give thanks unto the Lord, for He is gracious, and his mercy endures forever. — Psalm 106)
[ Post Reply | Private Reply | To 10 | View Replies ]

Free Republic
Browse · Search
General/Chat
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson